|
Cleanroom concepts involves mostly 10,000 & 100,000 class rooms, stringent demand on indoor conditions (low humidity), hygienic demand on air handling unit & IQ/OQ documentation.

- Complete Design engineering & consultancy.
- Air side system with AHUs, Veloduct, HEPA filteration, De-humidification technology.
- Dust extraction, Central Vacuum Cleaning system (CVC).
- Water side system with chillers, primary & secondary pumps, pipes etc.,
- Control & Monitoring system.
- Project Management, Installation, pressure balancing, complete system commissioning.
- DQ, IQ, OQ & PQ documentation.
|